ICE CLASS

MARINESHELF publishes articles contributed by seafarers and other marine related sites solely for the benefit of seafarers .All copyright materials are owned by its respective authors or publishers.
Where additional strengthening is fitted for navigation in ice conditions
an appropriate notation may be assigned. The notations fall into two
groups: those where additional strengthening is added for first-year ice, i.e.
service where waters ice up in winter only; and those where additional
strengthening is added for multi-year ice, i.e. service in Arctic and Antarc-
tic. It is the responsibility of the owner to determine which notation is most
suitable for his requirements.
Notations are:
-
FIRST
YEAR
ICE
Special features notations are:
Ice Class 1As unbroken level ice with thickness of 1 m.
Ice Class 1A unbroken level ice with thickness of 0.8m.
Ice Class 1B unbroken level ice with thickness of 0.6m.
Ice Class 1C unbroken level ice with thickness of 0.4m.
Ice Class 1 D same as 1C but only requirements for strengthening the for-
ward region, the rudder and steering arrangements apply.
-
MULTI
YEAR
ICE
The addition of the term ‘icebreaking’ to the ship type notation, e.g. ‘ice-
breaking tanker’ plus the following special features notation:
Ice Class AC1 Arctic or Antarctic ice conditions equivalent to unbroken
ice with a thickness of 1 m.
Ice Class AC1.5 Arctic or Antarctic ice conditions equivalent to unbroken
ice with a thickness of 1.5 m.
Ice Class AC2 Arctic or Antarctic ice conditions equivalent to unbroken
ice with a thickness of 2 m.
Ice Class AC3 Arctic or Antarctic ice conditions equivalent to unbroken
ice with a thickness of 3 m.
Ships specially designed for icebreaking duties are assigned the ship type
notation ‘icebreaker’ plus the appropriate special features notation for the
degree of ice strengthening provided

SHIP DIMENSIONS AND FORMS

MARINESHELF publishes articles contributed by seafarers and other marine related sites solely for the benefit of seafarers .All copyright materials are owned by its respective authors or publishers.

The hull form of a ship may be defined by a number of dimensions and
terms which are often referred to during and after building the vessel. An
explanation of the principal terms is given below:
After Perpendicular (AP)
: A perpendicular drawn to the waterline at the point
where the aft side of the rudder post meets the summer load line. Where no
rudder post is fitted it is taken as the centre line of the rudder stock.
Forward Perpendicular (FP)
: A perpendicular drawn to the waterline at the
point where the foreside of the stem meets the summer load line.
Length Between Perpendiculars (LBP)
: The length between the forward and aft
perpendiculars measured along the summer load line.
Amidships
: A point midway between the after and forward perpendiculars.
Length Overall (LOA)
: Length of vessel taken over all extremities.
Lloyd’s Length
: Used for obtaining scantlings if the vessel is classed with
Lloyd’s Register. It is the same as length between perpendiculars except that
it must not be less than 96 per cent and need not be more than 97 per cent of
the extreme length on the summer load line. If the ship has an unusual stem
or stern arrangement the length is given special consideration.
Register Length
is the length of ship measured from the fore-side of
the head of the stem to the aft side of the head of the stern post or, in the
case of a ship not having a stern post, to the fore-side of the rudder stock. If
the ship does not have a stern post or a rudder stock, the after terminal is
taken to be the aftermost part of the transom or stern of the ship. This
length is the official length in the register of ships maintained by the flag
state and appears on official documents relating to ownership and other
matters concerning the business of the ship. Another important length
measurement is what might be referred to as the
IMO Length
. This length is
found in various international conventions such as the Load Line, Tonnage
and SOLAS conventions and determines the application of requirements of
those conventions to a ship. It is defined as 96 per cent of the total length on
a waterline at 85 per cent of the least moulded depth measured from the
top of keel, or the length from the fore-side of stem to the axis of rudder
stock on that waterline, if that is greater. In ships designed with a rake of keel
the waterline on which this length is measured is taken parallel to the design

waterline.
Moulded dimensions are often referred to; these are taken to the inside
of plating on a steel ship.
Base Line
: A horizontal line drawn at the top of the keel plate. All vertical
moulded dimensions are measured relative to this line.
Moulded Beam
: Measured at the midship section is the maximum moulded
breadth of the ship.
Moulded Draft
: Measured from the base line to the summer load line at the
midship section.
Moulded Depth
: Measured from the base line to the heel of the upper deck
beam at the ship’s side amidships.
Extreme Beam
: The maximum beam taken over all extremities.
Extreme Draft
: Taken from the lowest point of keel to the summer load line.
Draft marks represent extreme drafts.
Extreme Depth
: Depth of vessel at ship’s side from upper deck to lowest
point of keel.
Half Breadth
: Since a ship’s hull is symmetrical about the longitudinal
centre line, often only the half beam or half breadth at any section is given.
Freeboard
: The vertical distance measured at the ship’s side between the
summer load line (or service draft) and the freeboard deck. The freeboard
deck is normally the uppermost complete deck exposed to weather and sea
which has permanent means of closing all openings, and below which all
openings in the ship’s side have watertight closings.
Sheer
: Curvature of decks in the longitudinal direction. Measured as the
height of deck at side at any point above the height of deck at side amid-
ships.
Camber (or Round of Beam)
: Curvature of decks in the transverse direction.
Measured as the height of deck at centre above the height of deck at side.
Rise of Floor (or Deadrise)
: The rise of the bottom shell plating line above
the base line. This rise is measured at the line of moulded beam.
Half Siding of Keel
: The horizontal flat portion of the bottom shell measured
to port or starboard of the ship’s longitudinal centre line. This is a useful
dimension to know when dry-docking.
Tumblehome
: The inward curvature of the side shell above the summer
load line.
Flare
: The outward curvature of the side shell above the waterline. It promotes
dryness and is therefore associated with the fore end of ship.
Stem Rake
: Inclination of the stem line from the vertical.
Keel Rake
: Inclination of the keel line from the horizontal. Trawlers and
tugs often have keels raked aft to give greater depth aft where the propeller
diameter is proportionately larger in this type of vessel. Small craft occa-
sionally have forward rake of keel to bring propellers above the line of keel.
Tween Deck Height
: Vertical distance between adjacent decks measured from
the tops of deck beams at ship side

SHIP CONTRACTS

MARINESHELF publishes articles contributed by seafarers and other marine related sites solely for the benefit of seafarers .All copyright materials are owned by its respective authors or publishers.

The successful tendering shipbuilder will prepare a building specification
for approval by the owner or his representative which will form part of the
contract between the two parties and thus have legal status. This technical
specification will normally include the following information:
Brief description and essential qualities and characteristics of ship.
Principal dimensions.
Deadweight, cargo and tank capacities, etc.
Speed and power requirements.
Stability requirements.
Quality and standard of workmanship.
Survey and certificates.
Accommodation details.
Trial conditions.
Equipment and fittings.
Machinery details, including the electrical installation, will normally be
produced as a separate section of the specification.
Most shipbuilding contracts are based on one of a number of standard
forms of contract which have been established to obtain some uniformity in
the contract relationships between builders and purchasers. Three of the
most common standard forms of contract have been established by:
1. AWES—Association of West European Shipbuilders.
2. MARAD Maritime Administration, USA.
3. SAJ Shipowners Association of Japan.
The AWES standard form of contract includes:
1. Subject of contract (vessel details, etc.).
2. Inspection and approval.
3. Modifications.
4. Trials.
5. Guarantee (speed, capacity, fuel consumption).
6. Delivery of vessel.
7. Price.
8. Property (rights to specification, plans, etc.).
9. Insurance.
10. Defaults by the purchaser.
11. Defaults by the contractor.
12. Guarantee (after delivery).
13. Contract expenses.
14. Patents.
15. Reference to expert and arbitration.
16. Conditions for contract to become effective.
17. Legal domicile (of purchaser).
18. Assignment (transfer of purchaser’s rights to third party).
Irrespective of the source of the owner’s funds for purchasing the ship
payment to the shipbuilder is usually made as progress payments which are
stipulated in the contract under item 7 above. A typical payment schedule
may have been as follows:
10 per cent on signing contract.
10 per cent on arrival of materials on site.
10 per cent on keel laying.
20 per cent on launching.
50 per cent on delivery.
Given modern construction techniques, where the shipbuilder’s cash
flow during the building cycle can be very different from that indicated
above with traditional building methods, the shipbuilder will probably
prefer payments to be tied to different key events. Also of concern to the
shipbuilder employing modern building procedures is item 3 in the standard
form of contract where modifications called for at a late date by the owner
can have a dramatic effect on costs and delivery date given the detail now
introduced at an early stage of the fabrication process.