MARINESHELF publishes articles contributed by seafarers and other marine related sites solely for the benefit of seafarers .All copyright materials are owned by its respective authors or publishers.
The Plimsoll line is a reference mark located on a ship’s hull that indicates the maximum depth to which the vessel may be safely immersed when loaded with cargo. This depth varies with a ship’s dimensions, type of cargo, time of year, and the water densities encountered in port and at sea. Once these factors have been accounted for, a ship’s captain can determine the appropriate Plimsoll line needed for the voyage.Samuel Plimsoll (1824–1898) was a member of the British Parliament who was concerned with the loss of ships and crews due to vessel overloading. In 1876, he persuaded Parliament to pass the Unseaworthy Ships Bill, which mandated marking a ship’s sides with a line that would disappear below the waterline if the ship was overloaded. The line, also known as the Plimsoll mark, is found midship on both the port and starboard hulls of cargo vessels and is still used worldwide by the shipping industry
The waterline is the line where the hull of a ship meets the surface of the water, in concept or reality. Specifically, it is also the name of a special marking, also known as the International Load Line, Plimsoll line or water line (positioned amidships), that indicates the draft of the ship and the legal limit to which a ship may be loaded for specific water types and temperatures in order to safely maintain buoyancy, Particularly with regard to the hazard of waves that may arise. Temperature affects the level, because warm water provides less buoyancy, being less dense than cold water, as does salinity, because fresh water is less dense than seawater. For vessels with displacement hulls, the hull speed is determined by, among other things, the waterline length. In a sailing boat, the waterline length can change significantly as the boat heels, and can dynamically affect the speed of the boat.
The waterline can also refer to any line on a ship's hull that is parallel to the water's surface when the ship is afloat in a normal position. Hence, all waterlines are one class of "ships lines" used to denote the shape of a hull in Naval Architecture plans.
In aircraft design, the term "waterline" refers to the vertical location of items on the aircraft. This is (normally) the "Z" axis of an XYZ coordinate system, the other two axes being the Fuselage Station (X) and Buttock Line (Y).
The purpose of a load line is to ensure that a ship has sufficient freeboard (the height from the water line to the main deck) and thus sufficient reserve buoyancy. The freeboard of commercial vessels is measured between the lowest point of the uppermost continuous deck at side and the waterline and this must not be less than the freeboard marked on the Load Line Certificate issued to that ship. All commercial ships, other than in exceptional circumstances, have a load line symbol painted amidships on each side of the ship. This symbol must also be permanently marked, so that if the paint wears off it remains visible. The load line makes it easy for anyone to determine if a ship has been overloaded. The exact location of the load line is calculated and/or verified by a Classification Society and that society issues the relevant certificates. This marking was invented in the 1870s by Samuel Plimsoll.
The first official loading regulations are thought to date back to maritime legislation originating with the kingdom of Crete in 2,500 BC when vessels were required to pass loading and maintenance inspections. Roman sea regulations also contained similar regulations.
In the Middle Ages the Venetian Republic,the city of Genoa and the Hanseatic League required ships to show a load line. In the case of Venice this was a cross marked on the side of the ship, and of Genoa three horizontal lines.[citation needed]
The first 19th century loading recommendations were introduced by Lloyd's Register of British and Foreign Shipping in 1835, following discussions among shipowners, shippers and underwriters. Lloyds recommended freeboards as a function of the depth of the hold (three inches per foot of depth). These recommendations, used extensively until 1880, became known as "Lloyd's Rule".
In the 1860s, after increased loss of ships due to overloading, a British MP, Samuel Plimsoll, took up the load line cause. A Royal Commission on unseaworthy ships was established in 1872, and in 1876 the United Kingdom Merchant Shipping Act made the load line mark compulsory, although the positioning of the mark was not fixed by law until 1894. In 1906, laws were passed requiring foreign ships visiting British ports to be marked with a load line. It was not until 1930 (The 1930 Load Line Convention) that there was international agreement for universal application of load line regulations.
In 1966 a Load Lines Convention was held in London which re-examined and amended the 1930 rules. The 1966 Convention has since seen amendments in 1971, 1975, 1979, 1983, 1995 and 2003.
The original "Plimsoll mark" was a circle with a horizontal line through it to show the maximum draft of a ship. Additional marks have been added over the years, allowing for different water densities and expected sea conditions.
Letters may also appear to the sides of the mark indicating the classification society that has surveyed the vessel's load line. The initials used include AB for the American Bureau of Shipping, LR for Lloyd's Register, GL for Germanischer Lloyd, BV for Bureau Veritas, IR for the Indian Register of Shipping, RI for the Registro Italiano Navale, NK for Nippon Kaiji Kyokai, and NV for Det Norske Veritas. These letters should be approximately 115 millimetres in height and 75 millimetres in width. The Load Line Length is referred to during and following load line calculations.
The letters on the load line marks have the following meanings:
The Summer load line is the primary load line and it is from this mark that all other marks are derived. The position of the summer load line is calculated from the Load Line Rules and depends on many factors such as length of ship, type of ship, type and number of superstructures, amount of sheer, bow height and so on. The horizontal line through the circle of the Plimsoll mark is at the same level as the summer load line.
The Winter load line is one forty-eighth of the summer load draft below the summer load line.
The Tropical load line is one forty-eighth of the summer load draft above the summer load line.
The Fresh Water load line is an amount equal to centimetres above the summer load line where is the displacement in metric tonnes at the summer load draft and T is the metric tonnes per centimetre immersion at that draft.
In any case where cannot be ascertained the fresh water load line is at the same level as the tropical load line.
The position of the Tropical Fresh load line relative to the tropical load line is found in the same way as the fresh water load line is to the summer load line.
The Winter North Atlantic load line is used by vessels not exceeding 100 metres in length when in certain areas of the North Atlantic Ocean during the winter period. When assigned it is 50 millimetres below the winter mark.
The letters on the Timber Load line marks have the following meanings:
The Winter Timber load line is one thirty-sixth of the Summer Timber load draft below the Summer Timber load line.
The Tropical Timber load line is one forty-eighth of the Summer Timber load draft above the Summer timber load line.
The Timber Fresh and the Tropical Timber Fresh load lines are calculated in a similar way to the Fresh Water and Tropical Fresh water load lines except that the displacement used in the formula is that of the vessel at her Summer Timber load draft. If this cannot be ascertained then these marks will be one forty-eighth of the Timber Summer draft above the Timber Summer and Timber Tropical marks respectively.
The Timber Winter North Atlantic load line is at the same level as the Winter North Atlantic load line
The Plimsoll line is a reference mark located on a ship’s hull that indicates the maximum depth to which the vessel may be safely immersed when loaded with cargo. This depth varies with a ship’s dimensions, type of cargo, time of year, and the water densities encountered in port and at sea. Once these factors have been accounted for, a ship’s captain can determine the appropriate Plimsoll line needed for the voyage.Samuel Plimsoll (1824–1898) was a member of the British Parliament who was concerned with the loss of ships and crews due to vessel overloading. In 1876, he persuaded Parliament to pass the Unseaworthy Ships Bill, which mandated marking a ship’s sides with a line that would disappear below the waterline if the ship was overloaded. The line, also known as the Plimsoll mark, is found midship on both the port and starboard hulls of cargo vessels and is still used worldwide by the shipping industry
The waterline is the line where the hull of a ship meets the surface of the water, in concept or reality. Specifically, it is also the name of a special marking, also known as the International Load Line, Plimsoll line or water line (positioned amidships), that indicates the draft of the ship and the legal limit to which a ship may be loaded for specific water types and temperatures in order to safely maintain buoyancy, Particularly with regard to the hazard of waves that may arise. Temperature affects the level, because warm water provides less buoyancy, being less dense than cold water, as does salinity, because fresh water is less dense than seawater. For vessels with displacement hulls, the hull speed is determined by, among other things, the waterline length. In a sailing boat, the waterline length can change significantly as the boat heels, and can dynamically affect the speed of the boat.
The waterline can also refer to any line on a ship's hull that is parallel to the water's surface when the ship is afloat in a normal position. Hence, all waterlines are one class of "ships lines" used to denote the shape of a hull in Naval Architecture plans.
In aircraft design, the term "waterline" refers to the vertical location of items on the aircraft. This is (normally) the "Z" axis of an XYZ coordinate system, the other two axes being the Fuselage Station (X) and Buttock Line (Y).
The purpose of a load line is to ensure that a ship has sufficient freeboard (the height from the water line to the main deck) and thus sufficient reserve buoyancy. The freeboard of commercial vessels is measured between the lowest point of the uppermost continuous deck at side and the waterline and this must not be less than the freeboard marked on the Load Line Certificate issued to that ship. All commercial ships, other than in exceptional circumstances, have a load line symbol painted amidships on each side of the ship. This symbol must also be permanently marked, so that if the paint wears off it remains visible. The load line makes it easy for anyone to determine if a ship has been overloaded. The exact location of the load line is calculated and/or verified by a Classification Society and that society issues the relevant certificates. This marking was invented in the 1870s by Samuel Plimsoll.
The first official loading regulations are thought to date back to maritime legislation originating with the kingdom of Crete in 2,500 BC when vessels were required to pass loading and maintenance inspections. Roman sea regulations also contained similar regulations.
In the Middle Ages the Venetian Republic,the city of Genoa and the Hanseatic League required ships to show a load line. In the case of Venice this was a cross marked on the side of the ship, and of Genoa three horizontal lines.[citation needed]
The first 19th century loading recommendations were introduced by Lloyd's Register of British and Foreign Shipping in 1835, following discussions among shipowners, shippers and underwriters. Lloyds recommended freeboards as a function of the depth of the hold (three inches per foot of depth). These recommendations, used extensively until 1880, became known as "Lloyd's Rule".
In the 1860s, after increased loss of ships due to overloading, a British MP, Samuel Plimsoll, took up the load line cause. A Royal Commission on unseaworthy ships was established in 1872, and in 1876 the United Kingdom Merchant Shipping Act made the load line mark compulsory, although the positioning of the mark was not fixed by law until 1894. In 1906, laws were passed requiring foreign ships visiting British ports to be marked with a load line. It was not until 1930 (The 1930 Load Line Convention) that there was international agreement for universal application of load line regulations.
In 1966 a Load Lines Convention was held in London which re-examined and amended the 1930 rules. The 1966 Convention has since seen amendments in 1971, 1975, 1979, 1983, 1995 and 2003.
The original "Plimsoll mark" was a circle with a horizontal line through it to show the maximum draft of a ship. Additional marks have been added over the years, allowing for different water densities and expected sea conditions.
Letters may also appear to the sides of the mark indicating the classification society that has surveyed the vessel's load line. The initials used include AB for the American Bureau of Shipping, LR for Lloyd's Register, GL for Germanischer Lloyd, BV for Bureau Veritas, IR for the Indian Register of Shipping, RI for the Registro Italiano Navale, NK for Nippon Kaiji Kyokai, and NV for Det Norske Veritas. These letters should be approximately 115 millimetres in height and 75 millimetres in width. The Load Line Length is referred to during and following load line calculations.
The letters on the load line marks have the following meanings:
TF
– Tropical Fresh WaterF
– Fresh WaterT
– Tropical SeawaterS
– Summer Temperate SeawaterW
– Winter Temperate SeawaterWNA
– Winter North Atlantic
The Summer load line is the primary load line and it is from this mark that all other marks are derived. The position of the summer load line is calculated from the Load Line Rules and depends on many factors such as length of ship, type of ship, type and number of superstructures, amount of sheer, bow height and so on. The horizontal line through the circle of the Plimsoll mark is at the same level as the summer load line.
The Winter load line is one forty-eighth of the summer load draft below the summer load line.
The Tropical load line is one forty-eighth of the summer load draft above the summer load line.
The Fresh Water load line is an amount equal to centimetres above the summer load line where is the displacement in metric tonnes at the summer load draft and T is the metric tonnes per centimetre immersion at that draft.
In any case where cannot be ascertained the fresh water load line is at the same level as the tropical load line.
The position of the Tropical Fresh load line relative to the tropical load line is found in the same way as the fresh water load line is to the summer load line.
The Winter North Atlantic load line is used by vessels not exceeding 100 metres in length when in certain areas of the North Atlantic Ocean during the winter period. When assigned it is 50 millimetres below the winter mark.
Timber load line marks
Certain vessels are assigned Timber Freeboards, but before these can be assigned certain additional conditions have to be met. One of these conditions is that the vessel must have a forecastle of at least 0.07 the length of the vessel and of not less than standard height, which is 1.8 metres for a vessel 75 metres or less in length and 2.3 metres for a vessel 125 metres or more in length with intermediate heights for intermediate lengths. A poop or raised quarter deck is also required if the length is less than 100 metres. The letter L prefixes the load line marks to indicate a timber load line. Except for the Timber Winter North Atlantic freeboard the other freeboards are less than the standard freeboards. This allows these ships to carry additional timber as deck cargo, but with the facility to jettison this cargo.The letters on the Timber Load line marks have the following meanings:
LTF
– Timber Tropical Fresh WaterLF
– Timber Fresh WaterLT
– Timber Tropical SeawaterLS
– Timber Summer SeawaterLW
– Timber Winter SeawaterLWNA
–Timber Winter North Atlantic
The Winter Timber load line is one thirty-sixth of the Summer Timber load draft below the Summer Timber load line.
The Tropical Timber load line is one forty-eighth of the Summer Timber load draft above the Summer timber load line.
The Timber Fresh and the Tropical Timber Fresh load lines are calculated in a similar way to the Fresh Water and Tropical Fresh water load lines except that the displacement used in the formula is that of the vessel at her Summer Timber load draft. If this cannot be ascertained then these marks will be one forty-eighth of the Timber Summer draft above the Timber Summer and Timber Tropical marks respectively.
The Timber Winter North Atlantic load line is at the same level as the Winter North Atlantic load line
No comments:
Post a Comment