WHEN IS A LETTER OF PROTEST ISSUED


Reasons for issuing a Letter of Protest :
  1. Delays/incidents during berthing/un berthing
  2. Delays at loading/discharge terminal (e.g. delays due to waiting for customs or immigration clearance ; waiting for pilot(s) , tug(s) ; waiting for orders to start loading /discharging ; waiting for another ship to finish , waiting for daylight ; other)
  3. Vessel overloaded/short loaded according to C/P
  4. Difference between B/L and ship’s figure (quantity)
  5. Bill of Lading does not contain C/P date ; named discharge port ; cargo quantity ; other.
  6. Slow loading at the request of the terminal
My vessel is capable of  receiving …………..(quantity)/hour whereas the average loading rate provided by the terminal was ………….
  1. Difficulty measuring ullages due to inclement weather/sea conditions
Wind …..direction………force………Beaufort
Waves….direction……….height……..meter/ft
Swell …..direction……….height……..meter/ft
  1. Free water in ship’s tanks
Free water in ship’s tanks prior loading ……………….
Free water in ship’s tanks after loading ………………..
  1. Restrictions imposed by discharge terminal (e.g.- line displacement ; high back pressure ; 
shore tank(s) far away and/or elevated ; slow pumping rate requested to raise roof of floating tank ; shore tank(s) full etc.)     
  1. Waiting for cargo calculations/documents after completion of loading/discharge
Completed loading/discharge ……………(date/time)
Completed cargo calculations…………….(date/time)
Cargo documents on board and signed…..(date/time)
  1. Crude oil washing at discharge terminal . (If the terminal restricts the number of tanks to
be crude washed , state that “ vessel is not responsible for non-pumpable cargo remaining
in the non-COW-ed tanks)
  1. Delays during discharge caused by excessive sludge in cargo (Besides name of cargo ,
API/s.g. ,temperature , state that sludge was found in following tanks , attaching also a
Separate sheet with details/soundings/stripping pump log)
  1. Delays during discharge caused by gaseous cargo (high Reid vapour pressure) (State
Name of cargo , API/s.g. , RVP , temperature ; attach separate sheet with details , with soundings and with stripping pump log)
  1. Cargo temperature differences ( If the loading temperature of the loaded cargo differs
from the actual temperature received at ship’s manifold / or in ship’s tanks)
  1. Delays caused by non-delivery of original Bill of Lading at discharge port
  2. Unsafe port (Describe weather , sea conditions , swell , UKC , availability of Pilot(s) and/or tug(s) , other)
  3. Unsafe berth  (Attach a mooring diagram stating that in your opinion the berth is unsafe
due to following reason(s)….)
      18.  Other LoP ((Details)